Excavation work is underway to construct the excavation pit for future sections 3, 4 and 5.
A drilling rig is operating at the construction site, and the installation of sheet piling for the excavation pit using bored piles has begun.
The installation of an external heat supply network is underway to remove the last building from under the site.
We are beginning to dismantle the retaining wall along Knyahyni Olhy St.
The installation of a fence and wheel wash for trucks from the side of the Mark shopping center has been completed.