Preparatory work is underway at the MECENAT construction site:
- A fence has been erected around the perimeter of the site, and a construction site has been set up.
- The planned dismantling of the building located on the site and clearing of the territory are underway.
- Temporary networks are being laid.
Video report from the construction site as of May 1, 2025.